







This was a big one. A full commercial indoor pool build - gunite shell, coping, and tile across multiple bodies of water, all inside an active construction site. The kind of job that requires a crew who knows how to work clean, stay coordinated, and get the details right when it really counts.
Here's what we were working with early on: raw gunite shells set inside a building still under heavy construction. Dirt floors, open walls, equipment staged throughout. Our crew came in, got set up, and started laying coping stone along the pool perimeters. That part alone takes patience. Every piece has to be leveled and set correctly, because coping is what the eye goes to first - and it's what everything else lines up against.
Once the coping was locked in, we moved to tile. The lap pool got a sharp blue tile line running the full perimeter at the waterline, with matching lane markers tiled into the floor of the pool itself. The therapy pool got a bold red tile border that gives it a distinct look from the main pool. Two separate pools, two different tile schemes, both executed clean. That's the kind of scope that takes real coordination to pull off without cutting corners.
What you end up with is a finished product that looks exactly like it should - water in, coping tight, tile straight, everything polished. The tile and coping aren't just decorative. They protect the pool structure at the waterline and give the deck edge a safe, finished transition. When it's done right, it looks effortless. Getting it there is anything but.
Commercial pool work like this is a different animal than a backyard build. Tighter timelines, more trades working around you, higher stakes on every detail. Our crew handles it the same way every time - methodical, focused, and not done until it's right.