The patio that was failing underneath
A simple tear-out and replace turned into something bigger: under the old patio the soil was saturated and unstable. Instead of building over it, we dug about four more feet down to solid ground, rebuilt with reinforced aggregate base in compacted lifts with geogrid, added drainage under the patio, then built the new walls and patio on top.
★★★★★ “Kyle found our old patio was built improperly, lacking proper drainage. The old patio had years of rain water trapped under it causing the floor and walls to break.”David Weber